Client:
Status:
Project Type:
Completion Year:

JTC
Completed
Engineering
2019 - 2022

- Construct Temporary Bypass Road for Pasir Ris Farmway 2 to Pasir Ris Ind. Drive 1 after Demolish Affected Pet Farm.

- Backfill & Construct 450m of Pasir Ris Ind Drive 1 Including Road, Drain and Sewer.

- Sewer Works at Lorong Halus, Pasir Ris Coast Ind. Park 6, Pasir Ris Ind. Drive 3 and Pasir Ris Dr. 12.

- Outlet Drain Works along Pasir Ris Ind. Dr 1, Lorong Halus up to Junction of Lorong Halus and Pasir Ris Coast Ind. Park 6.

- Construction of 1.6km Pasir Ris Industrial Dr 3 with road width 39.2m including modification to existing Pasir Ris Dr 3, Pasir Ris Dr 12, Pasir Ris Farmway 1, Pasir Ris Coast Industrial Park 2 and Pasir Ris Coast Industrial Park 6.

- Construction 450m road raising, 28m wide trapezoidal drain and associated outfall, construction of 1500mm dia. trunk sewer along Pasir Ris Industrial Drive 1 and Pasir Ris Drive 12.

JTC-WFP

Construction of Roads, Drains and Sewers at Pasir Ris Water Fabrication Park (WFP)