Client:
Status:
Project Type:
Completion Year:
Changi Airport Group
Completed
Engineering
2014
The Sub-Contract Works for the External Works and Bridge Works comprises of the following:
1. Site Clearance & Demolition
2. All Drainage System and Vehicle Pavement of the Proposed T4 & Slip Road Linking from PIE Into Airport Boulevard
3. RC Works for Concrete Plinth for Floodlight, OG & Aircraft Plinth at Fixed Gangway @ Airside
4. Retaining Wall for Proposed Slip Road from PIE into Airport Boulevard
5. Vehicular Slab Over Bridge 1 & 2
6. 600m length Vehicular Airside Bridge - AS-1 Bridge
7. Vehicular Bridge LS-1 Bridge
8. Access Ramp Bridge T4-1, T4-2 & T4-3 Bridges
9. 240m length POB Bridge Linking SATS Kitchen to Airport Police Station
Singapore Changi Airport T4
Development of Terminal 4 Singapore Changi Airport (External and Bridge Works)

