
Development of Aircraft Stands, Taxiways, Ancillary Buildings and Associated Works for T5

Construction of Infrastructure Works at Bulim (Phase 2)

Proposed Construction of Aircraft Parking Stands, Taxilane Extension and Associated Works at Changi Creek, Singapore Changi Airport
Enhancement to Loyang Avenue Between Tampines Expressway and Pasir Ris Drive 3

Design and Construction of JW5 Station and Viaduct for Jurong region Line

Design and Construction of Nanyang Gateway Station, Nanyang Crescent Station and Viaduct for Jurong Region Line

Design and Build of Vehicular Bridge at Grade Roads and Other Associated Works at Pulau Punggol Barat

Commuter and Infrastructure works at Hillview, Dairy Farm and Tuas Area

Construction of Viaduct from TPE to PIE (Westbound) and Upper Changi Road East

Construction of Roads, Drains and Sewers at Pasir Ris Water Fabrication Park (WFP)

New Road between Lorong Halus and Pasir Ris Industrial Drive 1 Including Expansion of KPE/TPE Interchange

Expansion of KPE/TPE Interchange Including Link Road to Punggol Central

Temporary Road at Punggol

Widening of Woodlands Road, Choa Chu Kang Link and Stagmont Ring

Development of Terminal 4 Singapore Changi Airport (External and Bridge Works)

Proposed Construction of Vehicular Underpass, Drains & Associated Works along Airport Boulevard

Widening of Bukit Batok East Ave 3 & Improvement of PIE slip road between Clementi North Flyover and Toh Tuck Flyover

Widening of Pan Island Expressway (PIE) between Bukit Timah Expressway (BKE) Interchange to Adam Road

Widening of Pan Island Expressway (PIE) between Clementi Avenue 6 and Bukit Timah Expressway